Many companies assume that cloud computing projects fail because the technology itself is flawed. The reality is almost always different: failures are caused by how organizations structure ownership, align incentives, and assign accountability. When the teams responsible for building systems are separate from the teams responsible for running them, even the most advanced technology can underperform or fail entirely.

Two decades ago, cloud computing promised a revolution. Companies could trade large upfront infrastructure costs for flexible operational spending while scaling systems rapidly. The technology worked, but early projects frequently stumbled because IT controlled the budgets while ops teams had to deliver results. Misaligned incentives created inefficiency, friction, and, in some cases, multi-billion-dollar failures.

This article explores the lessons from two very different approaches—GE’s Predix initiative and Netflix’s 2008 operational crisis—to show why organizational design, not technology, determines whether cloud, AI, or any new system succeeds.

From Hype to Control: How It Unfolded

2008–2012: The Lift-and-Shift Trap

When Amazon Web Services began gaining traction, many companies saw the cloud as a cost-saving opportunity. Central IT departments promised to reduce expenses by moving existing servers from company data centers to the cloud. This approach, called “lift and shift,” moved systems without changing how they were built or how teams operated.

The problem was clear: these systems weren’t designed for the cloud. They remained large, slow, and hard to manage. In many cases, costs went up instead of decreasing, and ops teams were left to handle the fallout. Lift-and-shift treated the cloud as a cheaper data center, not as a platform for agility or resilience.

2008-2016: Netflix’s Burning Platform

In 2008, Netflix experienced a major operational failure: a database corruption halted DVD shipments for 3 days. Instead of just migrating existing systems to the cloud, Netflix fundamentally changed ownership. Engineering and DevOps teams were given full responsibility for the systems they built and ran.

This alignment of responsibility and accountability created operational incentives: engineers had to maintain uptime, scalability, and reliability. The result was a resilient, agile system capable of scaling to 130 countries, demonstrating the cloud’s real potential.

2013-2017: The GE Predix Breakdown

GE tried to transform itself into a software-driven company with its “GE Digital” division, but the structure guaranteed conflict. GE Digital had its own P&L and acted as an internal vendor, “selling” cloud services to operational units like Aviation and Power. From the operations perspective, Predix felt like a costly competitor rather than a partner. Misaligned incentives and internal friction prevented adoption, and the $7 billion initiative collapsed.

The technology itself worked, but the organization’s approach to ownership and governance ensured failure. By separating the builders from the operators, GE created a predictable internal culture clash.

2016-Today: Cloud as Core Infrastructure

Netflix’s model became the blueprint for success. Teams that build systems also run them, aligning incentives and accountability. Governance functions, like Cloud Centers of Excellence and FinOps teams, now exist to guide cost, standards, and security, but the operational responsibility sits with the teams delivering results. Modern cloud adoption succeeds when the organization is structured to use technology effectively, not when technology is simply deployed.

Ownership Lessons: Who Owned It and Who Should Have

The GE Predix initiative shows what happens when ownership and incentives are misaligned. GE Digital, a separate division with its own P&L, was responsible for the platform, while operational units like Aviation and Power were treated as internal customers to sell to rather than partners to work with. Predictably, this created friction: Ops teams resisted the platform, approvals slowed, and pilots that should have tested real operational improvements turned into political battles. The technology itself was sound, but no team could succeed under these conditions.

Netflix provides the opposite example. After a 2008 database failure halted DVD shipments for three days, the company shifted ownership to the engineering and DevOps teams who built and ran the systems. By fusing the builder and the operator, incentives aligned directly with operational outcomes: uptime, scalability, and reliability became the team’s top priorities. This alignment prevented the culture clashes seen at GE and allowed the cloud to deliver on its promise of agility and resilience.

The lesson is clear: organizational structure and ownership determine whether technology succeeds or fails. A siloed “Digital” or “AI Lab” model mirrors GE Predix and is likely to trap pilots in politics. Embedded, accountable teams mirror the Netflix approach and create the conditions for technology to scale and deliver real value.

Turning Lessons into Action

The cloud era offers clear guidance for structuring AI, automation, or other tech initiatives. The principles are simple, but applying them immediately can prevent costly mistakes.

Core Principles:

  • Embed Ownership Where Work Happens: Responsibility and budget for a technology initiative should reside with the team that uses it. Siloed units with their own P&L create friction and resistance.

  • Fuse Builders and Operators: Teams that design systems should also run them. Direct accountability ensures resilience, scalability, and operational excellence.

  • Redesign Processes, Don’t Just Move Systems: Technology alone cannot fix broken workflows. Adoption succeeds only when processes are re-engineered to leverage the tool effectively.

Immediate Actions You Can Take Today:

  1. Map Ownership and Accountability: Identify which teams will use, maintain, and support your AI or automation initiatives. Ensure their budget and KPIs are aligned with operational outcomes.

  2. Assign Operational Responsibility to Builders: Make sure engineers, data scientists, or automation developers are accountable for the systems’ performance in production. This may involve embedding them with the operational team.

  3. Audit Workflows Before Deployment: Review existing processes and identify where technology will interact. Redesign workflows where necessary to maximize efficiency and adoption.

  4. Set Clear Metrics for Success: Align performance indicators (uptime, accuracy, speed, cost) with the teams responsible for outcomes. Avoid metrics that reward adoption alone or internal “sales” of the tool.

  5. Create Feedback Loops: Establish continuous monitoring and operational review so teams can adapt processes and technology iteratively, just as Netflix evolved its cloud operations over time.

By combining these principles with actionable steps, ops leaders can move beyond “innovation theater” and create tech initiatives that scale, deliver measurable value, and avoid the pitfalls GE Predix experienced.

The Final Takeaway

The cloud era showed that technology itself does not create value—organizational structure and ownership do. Siloed teams, misaligned incentives, and detached budgets create friction that even the most advanced systems can't overcome. By contrast, when builders are accountable for operations and responsibility sits where work actually happens, technology becomes an engine of resilience, scalability, and growth.

For today’s ops leaders, whether running AI pilots, automation initiatives, or any transformative project, the takeaway is clear: embed ownership, align incentives, and redesign processes before deploying technology. Do this, and you turn tools from experiments into real operational impact. Ignore it, and even the best technology risks becoming another costly failure.

Previous
Previous

Structure Over Software: Lessons from Building a New Executive Team

Next
Next

Your Holiday Surge Staff Is Already on Your Payroll